Installing Bridge Crane Rail

Installing Bridge Crane Rail

Installing bridge crane rail is a complex process that requires careful planning, preparation, and execution. Let us see them together.

  1. Site Preparation:
    • Clear the site of debris and obstacles.
    • Mark out rail track positions.
    • Ensure the stability and security of the supporting structure.
    • Provide necessary Personal Protective Equipment (PPE) for the installation team.
  2. Alignment and Leveling:
    • Precisely align rail tracks with runway beams.
    • Level tracks within a tolerance of 1/16 inch per 10 feet, using precision measuring tools like lasers and levels.
    • Ensure accurate alignment to prevent wear on crane wheels, enhancing efficiency and safety.
  3. Securing Rail Tracks:
    • Securely fasten rail tracks to the supporting structure.
    • Utilize high-strength bolts and appropriate fasteners.
    • Follow manufacturer’s recommendations based on rail track type and supporting structure design.
  4. Testing and Inspection:
    • Conduct final testing to verify safe and efficient crane system operation.
    • Perform load testing to confirm maximum load capacity.
    • Check for alignment issues and identify potential safety risks.
    • Promptly address any issues identified during testing and inspection.